Flow-chart of the
Installation of the 800
![]() |
A 60 ton truck transports the 800 equipments to the
facility. (The download of equipments occurred at night) |
![]() |
A Bruker engineer opens the box, which contains the magnet. |
![]() |
A crane lifts up the magnet from the truck. |
![]() |
The magnet is on the skatic platform. Bruker engineer is fixing an air skate. |
![]() |
The magnet is skating with three air skates on its buttom. |
![]() |
The magnet is very huge. One guy cannot completely hug it. |
![]() |
Mini Jacks are used to list up the magnet. |
|
|
Workers are constructing a platform around the magnet. |
|
|
What a solid and decent platform it is! |
|
|
The huge and ultra-stabilized Bruker magnet. The decay of magnetic field strength is only around 2-3 Hz/Hour. |
|
|
From left to right: Pumps box, Pumps Control Unit, UPS, Console, and Computer. |
|
|
The whole Bruker Avance 800 NMR Spectrometer. |
|
|
Manager is operating the spectrometer. |